27th July 2000

The roof tiles have been delivered (on the naturestrip) and all of the windows have been delivered (sitting on the front lawn). The first floor joists have been fitted, the sheet flooring laid, and the first floor frames constructed and erected. The Roof trussess have been delivered, and are sitting on top of the frame.
28th July 2000

The roof for the garage has been constructed, and the roof trussess for the house have been erected.
31st July 2000
The frame is finally complete! The windows and doors are all in, and the portico and balcony on the front has been erected.

Another shot showing the portico and balcony.

This shot shows the one-way glass on the ensuite windows. This means we'll be able to sit in the spa during the day with the curtains open :-)