30th June 2000

We've been away on holidays for the last 10 days, and this is what greeted us on our return. The bricks have been layed up to floor level, except for the garage, which has been bricked right up, the stumps have been put in, and the floor bearers and joists fitted. The sheet flooring has been delivered, and the frame has been started.

A shot inside the garage. In the foreground are the beams to support the house above the garage.

This shot shows the external frames for the ground floor have been constructed, but are yet to be erected.

4th July 2000

The frames, both internal and external for the ground floor have been erected. Unortunately, the joists for the first floor have not been delivered, so there will be yet another delay.